Lucent Technologies Window SLV 9124 Manual de usuario Pagina 131

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 271
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 130
Operation and Maintenance
5-22
9124-A2-LB20-00
March 2000
Table 5-10. PVC Connection Status (2 of 2)
Field What It IndicatesStatus
EDLCI 0 to 62 For multiplexed DLCIs only.
Identifies an individual link/
connection embedded within a
DLCI.
Status
Identifies whether the physical
interfaces, LMIs, and DLCIs are all
enabled and active for this PVC
connection.
Active
1
H The PVC is currently active.
Inactive H The PVC is inactive because:
– Alarm conditions and network
and SLV communication
status indicate that data
cannot be successfully
passed.
– The unit has disabled the
interface or frame relay link
due to internal operating
conventions.
– Activation of an alternate
virtual circuit is not warranted;
that is, no alarm condition on
the primary destination link
has been detected.
Disabled H The PVC cannot be activated
and is essentially disabled as a
result of how the unit was
configured. Possible causes:
– The physical interface at one
or both ends of the PVC is/are
disabled.
– The frame relay link on one or
both ends of the PVC is/are
disabled.
Invalid H Some portion of the PVC
connection is not fully configured.
1
For the circuit to be active, both Source and Destination Statuses must be Active.
Vista de pagina 130
1 2 ... 126 127 128 129 130 131 132 133 134 135 136 ... 270 271

Comentarios a estos manuales

Sin comentarios